Brunswick · Planning Commission

Planning Commission

2022-11-17View on CivicClerk ↗
Published Documents
11-17-2022 Minutes & Staff Report
Summary not yet available.
Full Meeting Transcriptclick to expand
Brunswick City Planning Commission 
                            November 17, 2022 – Caucus 
                                     6:30 p.m. 
 
                        Brad Saeger, Vice Chairman 
                        John Rocha, Recording Secretary 
                        Abbas Hasan, Member 
                        Joe Delsanter, Council Representative 
                        Pamela Plavecski, Planning & Zoning Coordinator 
                        Santo Incorvaia, Assistant Law Director 
                        Grant Aungst, Community & Economic Development Director 
                        Jennie Lods, BZA Secretary & Planning & Zoning Coordinator  
                              trainee 
                        Ed Begue, Baker Bednar Snyder & Associates, 628 Niles Cortland      
                              Road S.E., Suite 201, Warren 
                        Nate Zampelli, general contractor (no address given) 
                        Dale Haywood, Atwell Group, 7100 E. Pleasant Valley Road,  
                              Suite 220, Independence 
                        Ryan Fuerst, Atwell Group, same as above 
                        Patrick O’Hara, Liberty Ford, 3101 Center Road, Brunswick 
                         
                         
Vice Chairman Brad Saeger called the meeting to order at 6:38 p.m. 
The first item was the review of the discussion plan for the Liberty Ford service garage 
addition, 3101 Center Road.  Mr. Hasan stated he is concerned about the visibility of east 
elevation facing the I-71 off-ramp, in addition to the north elevation, and commented further 
architectural enhancements should be added to those elevations, to which Mr. Saeger 
concurred. 
 
Regarding building signage, Mr. Hasan questioned if the off-ramp would be counted as a 
street; Mr. Aungst responded yes.  
 
Mr. Saeger adjourned the meeting at 6:47 p.m. 
 
Respectfully, 
 
 
 
Pamela Plavecski 
 
                         
                         Brunswick City Planning Commission 
                                 November 17, 2022 
                                     6:50 p.m. 
 
                        Brad Saeger, Vice Chairman 
                        John Rocha, Recording Secretary 
                        Abbas Hasan, Member 
                        Joe Delsanter, Council Representative 
                        Pamela Plavecski, Planning & Zoning Coordinator 
                        Santo Incorvaia, Assistant Law Director 
                        Grant Aungst, Community & Economic Development Director 
                        Jennie Lods, BZA Secretary & Planning & Zoning Coordinator  
                              trainee 
                        Ed Begue, Baker Bednar Snyder & Associates, 628 Niles Cortland      
                              Road S.E., Suite 201, Warren 
                        Nate Zampelli, general contractor (no address given) 
                        Dale Haywood, Atwell Group, 7100 E. Pleasant Valley Road,  
                              Suite 220, Independence 
                        Ryan Fuerst, Atwell Group, same as above 
                        Patrick O’Hara, Liberty Ford, 3101 Center Road, Brunswick 
                         
                                           
                                       Item 1 
 
Vice Chairman Brad Saeger called the meeting to order at 6:50 p.m. 
 
MR. SAEGER MOTIONED TO EXCUSE CHAIRMAN JOE SHIRILLA AND JEFF ARONA 
FOR JUST CAUSE. 
 
Mr. Rocha seconded the motion.  The vote was 3 Ayes 0 Nays. 
 
Ms. Lods called the roll:  3 Present 2 Absent.  (Mr. Shirilla and Mr. Arona). 
 
                                       Item 2 
                                           
There were no announcements or correspondence. 
 
                                       Item 3 
                                           
MR. HASAN MOTIONED TO APPROVE THE MINUTES OF OCTOBER 20, 2022. 
 
Mr. Rocha seconded the motion.  The vote was 3 Ayes 0 Nays. 
 
                                           
                                      Item 4(a) 
 
Regarding the Liberty Ford service garage addition discussion plan, 3101 Center Road, Mr. 
Dale Haywood, and Mr. Ryan Fuerst, of Atwell Group; Mr. Ed Begue, of Baker Bednar 
Snyder & Associates; Mr. Nate Zampelli, general contractor; and Mr. Patrick O’Hara, of 
Liberty Ford, were present. 
 
Mr. Begue stated the service garage will be fully fire suppressed (sprinklered).  He explained 
the building is not intended for public use; however, three EV charging stations are located on 
the south side of the structure for public use.  He noted there will be no signage on the south 
elevation, as the service garage will be used by employees.  Mr. O’Hara noted Ford is 
requiring them to have public EV charging stations. 
 
The Staff Review Comments were addressed as follows: 
 
1.    The ten new parking spaces on the south side of the new service garage are 9’ wide, 
      pursuant to Table 1276-3; verify they have a minimum 19’ length.  Mr. Begue stated 
      the parking spaces will comply with that length, which will be shown on the detailed 
      site plan. 
 
2.    A dumpster enclosure is indicated on the east side of the site; verify it is not located 
      within the minimum 25’ side yard setback required by Section 1258.04(c).  
      Additionally, confirm the dumpster enclosure will be constructed with materials 
      comparable to the building, pursuant to Section 1276.12(a).  Mr. Begue stated the 
      enclosure does not encroach into the 25’ side yard setback and will be constructed 
      with split-face block comparable to the service garage.  Ms. Plavecski stated this shall 
      be shown on the detailed site plan. 
       
3.    Mr. Begue stated a photometrics plan indicating a minimum 0.6 footcandle level for the 
      ten new parking spaces on the south side of the service garage, as required by 
      Section 1276.14(a), will be submitted with the detailed site plan. 
       
4.    Any additional interior landscaping shall meet the requirements of Section 1282.08(b), 
      to which Mr. Begue agreed. 
       
5.    Per Fire Department requirements, two additional fire hydrants shall be added on 
      opposite ends of the building to meet the minimum 300’ distance between hydrants.  
      Mr. Begue reiterated the service garage will be fully sprinklered and didn’t see the 
      need for the two new fire hydrants.  Mr. Jones explained the Fire Department is 
      requiring them; to which Mr. Aungst concurred.  
       
6.    Six landscape islands are proposed to be removed from the site, but only three new 
      ones are proposed to be added.  Indicate the net additional acreage of impervious 
      surface that will result from the new island configuration, and verify that the 
      underground retention system will still meet the City’s stormwater management 
      requirements after adding the additional impervious surface to the site.  Mr. Haywood 
      stated they will supply summary stormwater calculations. 
       
7.    Additional architectural enhancements shall be added to the north and south building 
      elevations, in accordance with Section 1278.08(c).  Also, provide building material 
      samples to ensure compatibility with the existing main building, as required by Section 
      1278.08(e).  Mr. Saeger commented Liberty Ford is located at one of the gateways to 
      the city and stated the Planning Commission is concerned about the appearance of 
      the east elevation (facing I-71 off-ramp) and the south elevation (facing Center Road), 
      to which Mr. Hasan agreed.  Mr. Saeger suggested adding up/down lighting sconces, 
      to these elevations; Mr. Begue concurred.  Mr. Saeger also requested that 
      architectural enhancements should be added to the north elevation.  Mr. Hasan noted 
      the five lights over the eight bays on the west elevation should be more evenly spaced 
      to provide symmetry.  Mr. Saeger suggested adding accent colors on the east 
      elevation, in addition to adding wall sconces; Mr. Begue agreed.  Mr. Hasan suggested 
      that accent colors should also be added on the north elevation. 
       
      Mr. Seager noted there are tires being stored outside of the building, which is not 
      permitted.  Mr. Aungst inquired, as no wall signs are being installed on the south 
      elevation, what architectural features will be used there instead?  Mr. Zampelli replied 
      they will work with Mr. O’Hara on this.  Mr. Delsanter commented the accent lighting 
      should be sufficient to enhance the building; Mr. Zampelli stated they could add 
      sconces on all sides of the service garage.  Mr. Hasan suggested the south elevation 
      could be broken up with faux windows, color accents, and lighting. 
       
8.    The proposed sign on the south elevation measures 245 sq. ft.  As there is an existing 
      wall sign facing Center Road on the main building, this will result in a second wall sign, 
      which is not permitted by Table 1270.05 - B; therefore, a variance from the Board of 
      Zoning Appeals will be necessary.  If the above variance is not granted, whereby the 
      proposed sign is removed, additional architectural features shall be added to break up 
      the long expanse of blank wall, pursuant to Section 1278.08(c).  Additionally, all signs 
      shall comply with Chapter 1270; Section 1270.14(a) states where a nonconforming 
      sign(s) exists on the property subject to a permit application, no permit shall be issued 
      until such time as such nonconforming sign(s) is made to conform with the 
      requirements of this Chapter.  Mr. Begue reiterated no new signage is being added on 
      the service garage, as it is not for public use.  Mr. Aungst stated, per Ordinance No. 
      72-2021, adopted September 27, 2021, that all signage on the site must comply with 
      Chapter 1270. 
       
9.    There is an existing shed located behind the main building; will it be removed?  Mr. 
      O’Hara responded that hasn’t yet been determined. 
 
 
 
 
Mr. Saeger stated Mr. Arona, who was unable to attend tonight’s meeting, had the following 
questions: 

1.    Why isn’t the service garage tucked behind the building? 
2.    Why was this location chosen? 
 
Mr. Begue replied there is an underground stormwater management system behind the 
building and due to site grading, this is the best location. 
 
MR. HASAN MOTIONED TO MOVE THE DISCUSSION PLAN TO A DETAILED SITE PLAN 
AND PUBLIC HEARING ON THE CONDITIONAL ZONING CERTIFICATE FOR THE 
LIBERTY FORD SERVICE GARAGE, 3101 CENTER ROAD, SUBJECT TO THE 
FOLLOWING: 
 
THE APPLICANT WILL COMPLY WITH STAFF REVIEW COMMENTS 1 THROUGH 4, 
WHICH SHALL BE SHOWN ON THE DETAILED SITE PLAN.  THE APPLICANT WILL 
WORK WITH THE FIRE DEPARTMENT REGARDING THE LOCATION OF THE TWO 
ADDITIONAL FIRE HYDRANTS.  THE APPLICANT SHALL COMPLY WITH STAFF 
REVIEW COMMENT 6 AND PROVIDE SUMMARY STORMWATER MANAGEMENT 
CALCULATIONS.  IN COMPLIANCE WITH STAFF REVIEW COMMENT 7, ADDITIONAL 
ARCHITECTURAL ENHANCEMENTS, SUCH AS WALL SCONCES, SHALL BE ADDED ON 
THE NORTH, SOUTH, AND EAST ELEVATIONS OF THE SERVICE GARAGE.  PER 
STAFF REVIEW COMMENT 8, NO NEW SIGNAGE IS BEING ADDED TO THE BUILDING.  
ALL EXISTING SIGNS SHALL CONFORM TO CHAPTER 1270.  AS NOTED IN STAFF 
REVIEW COMMENT 9, THE DISPOSITION OF THE EXISTING SHED WILL BE INDICATED 
ON THE DETAILED SITE PLAN.  ALL OUTDOOR TIRE STORAGE SHALL BE REMOVED. 
 
Mr. Rocha seconded the motion.  The vote was 3 Ayes 0 Nays. 
 
                                       Item 5 
                                           
There was no old business. 
 
                                       Item 6 
                                           
Regarding the proposed 2023 Planning Commission Meeting Schedule, Mr. Rocha stated he 
is unable to attend the February 16, 2023 meeting.  Mr. Saeger stated he is unable to attend 
the July 13 and October 5, 2023 meetings. 
 
MR. HASAN MOTIONED TO ADOPT THE PLANNING COMMISSION 2023 MEETING 
SCHEDULE. 
 
Mr. Rocha seconded the motion.  The vote was 3 Ayes 0 Nays. 
 
                                           
                                       Item 7 
                                           
No one appeared at the public comment period.  Regarding the outdoor tire storage at Liberty 
Ford, Mr. Incorvaia stated no outdoor storage is permitted in the C-H Highway Interchange 
Commercial District. 
 
                                       Item 8 
                                           
Mr. Delsanter gave the Council Representative’s Report.  He commented the City Council 
Planning & Zoning Committee is working on drafting legislation for a Designated Outdoor 
Refreshment Area (DORA). 
 
MR. ROCHA MOTIONED TO ADJOURN THE MEETING. 
 
Mr. Hasan seconded the motion.  The vote was 3 Ayes 0 Nays. 
 
The meeting was adjourned at 7:40 p.m. 
 
Respectfully, 
 
 
 
Pamela Plavecski 
                                           
                                           
 
                         
                         
 
                         
                         
                                           
                         
                  PLANNING COMMISSION STAFF REPORT 
                                           
                               November 17, 2022 
                                           
Liberty Ford service garage 
(Discussion plan) 
 
Location:  3101 Center Road 
                 C-H District 
 
Proposed Use & Background: 
A discussion plan has been submitted to construct a 20,192 sq. ft. service garage on the east 
side of the existing parking lot addition that was approved by the Planning Commission on 
April 7, 2011.  Fourteen (14) service bays are proposed; seven each on the west and east 
elevations.   
 
Automotive repair garages are a conditionally permitted use in the C-H District, pursuant to 
Section 1258.03(h), subject to Section 1274.08(a), (d), (f), and (g) of the Zoning Code. There 
are no adjacent residential properties to the site; therefore, the 100’ setback requirement for a 
commercial structure from a residential or multifamily property line is not applicable in this 
instance. 
 
Table 1276-1(d)(7) requires a minimum of 28 parking spaces; 29 employee parking spaces 
are notated on Sheet 1.  Three electric vehicle charging stations are shown on the south side 
of service garage as part of the ten new spaces being installed in that area.  There is a 30’ 
aisle width between the new row of parking and the existing parking lot, which meets the 
minimum 24’ aisle width required by Table 1276-3. 
 
Pursuant to Section 1274.11(c), all areas used for vehicle display and areas used for 
customer, employee and other short-term parking and circulation shall be shown on the site 
plans approved by the Planning Commission for this purpose and shall be paved according to 
the requirements of Chapter 1276.  With Commission approval, areas for vehicle storage may 
be unpaved.  Parking areas designated for display or inventory may depart from the required 
standards for design of parking spaces and aisles in Chapter 1276.  Sheet C3.0 indicates 
total site parking of 58 employee spaces; 35 customer spaces; 4 employee/customer 
handicap spaces; 712 inventory spaces on the main lot; and 94 inventory spaces on the side 
lot, for a total of 903 spaces.  Construction of the service garage will result in removing 123 
existing spaces and adding 10 new spaces, for a net loss of 113 spaces.   
 
The building will be constructed with a standing seam metal roof, vertical metal siding on the 
upper portion of the building, and split-face block on the lower half.  The façade will 
incorporate white metal wall panels to match the existing service department white walls, and 
gray split-face block wainscot, roof, gutters and downspouts to match the gray accent colors 
on the existing showroom, in compliance with Section 1278.08(e).   
 
 
Staff Review Comments: 
1.    The ten new parking spaces on the south side of the new service garage are 9’ wide, 
      pursuant to Table 1276-3; verify they have a minimum 19’ length. 
 
2.    A dumpster enclosure is indicated on the east side of the site; verify it is not located 
      within the minimum 25’ side yard setback required by Section 1258.04(c).  
      Additionally, confirm the dumpster enclosure will be constructed with materials 
      comparable to the building, pursuant to Section 1276.12(a). 
       
3.    The detailed site plan shall include a photometrics plan indicating a minimum 0.6 
      footcandle level for the ten new parking spaces on the south side of the service 
      garage, as required by Section 1276.14(a). 
       
4.    Any additional interior landscaping shall meet the requirements of Section 1282.08(b). 
       
5.    Per Fire Department requirements, two additional fire hydrants shall be added on 
      opposite ends of the building to meet the minimum 300’ distance between hydrants. 
       
6.    Six landscape islands are proposed to be removed from the site, but only three new 
      ones are proposed to be added.  Indicate the net additional acreage of impervious 
      surface that will result from the new island configuration, and verify that the 
      underground retention system will still meet the City’s stormwater management 
      requirements after adding the additional impervious surface to the site. 
       
7.    Additional architectural enhancements shall be added to the north and south building 
      elevations, in accordance with Section 1278.08(c).  Also, provide building material 
      samples to ensure compatibility with the existing main building, as required by Section 
      1278.08(e). 
       
8.    The proposed sign on the south elevation measures 245 sq. ft., which exceeds the 
      maximum 200 sq. ft. permitted by Section 1270.05 – Table B.  As there is an existing 
      wall sign facing Center Road on the main building, this will result in a second wall sign, 
      which is not permitted by the above Table; therefore, variances from the Board of 
      Zoning Appeals will be necessary.  If the above variances are not granted, whereby 
      the proposed sign is removed, additional architectural features shall be added to break 
      up the long expanse of blank wall, pursuant to Section 1278.08(c).  Additionally, all 
      signs shall comply with Chapter 1270; Section 1270.14(a) states where a 
      nonconforming sign(s) exists on the property subject to a permit application, no permit 
      shall be issued until such time as such nonconforming sign(s) is made to conform with 
      the requirements of this Chapter. 
       
9.    There is an existing shed located behind the main building; will it be removed? 
 
Staff Recommendations: 
Staff recommends moving the discussion plan to a detailed site plan and public hearing for 
the conditional zoning certificate, provided the above items are addressed.
Planning Commission — 2022-11-17 | Urbyn